Country: Portugal Local: Sintra

Completion date: 2013
Contracting entity:
Municipal Services of Water and Sanitation (SMAS) of Sintra
Project description
Elaboração do Projeto de Execução da “Reabilitação da ETAR de Magoito”
The project consisted in the development of the Detailed Design of Magoito Wastewater Treatment Plant (WWTP) rehabilitation. The treatment capacity of the WWTP is approximately 5 200 inhabitants equivalent, with activated sludge process biological treatment, and tertiary treatment.
The team was responsible, among other activities, for the analysis of the base data, solution design, physical and hydraulic design of the infrastructures, measurement and budgeting of solutions, technical specifications, environmental and safety documents and preparation of all written and drawn documents associated with the Detailed Design Project.